Robin and Joel's Kitchen Remodel (Basement plumbing)

prev next


Update: Thur 17 Apr 2003

Yesterday the plumber dug up the floor in the basement and tied in the waste lines. (Wed 16 Apr 2003)

tiein2.jpg
tiein2.jpg
79.35 KB
waste10.jpg
waste10.jpg
67.05 KB
waste13.jpg
waste13.jpg
68.26 KB

Here the plumber is connecting the water lines. (Wed 16 Apr 2003)

plumber.jpg
plumber.jpg
79.17 KB
plumbtiein.jpg
plumbtiein.jpg
66.90 KB

Chuck insulated the exterior walls in the kitchen. The electricians put in the lights for the new eating nook. Robin is happy things are progressing. (Wed 16 Apr 2003)

inskit2.jpg
inskit2.jpg
81.08 KB
kitcan.jpg
kitcan.jpg
64.08 KB
happy.jpg
happy.jpg
82.99 KB

Here is what 80 years of crude in a kitchen sink waste line looks like. There is about half an inch of crude all around the inside of the pipe. (Wed 16 Apr 2003)

oldkitwaste.jpg
oldkitwaste.jpg
85.52 KB

The dirt from the basement dig was put back in the hole and cemented over. (Thur 17 Apr 2003)

dirt1.jpg
dirt1.jpg
81.85 KB
dirt3.jpg
dirt3.jpg
86.37 KB
cement1.jpg
cement1.jpg
61.56 KB
cement2.jpg
cement2.jpg
63.85 KB
names1.jpg
names1.jpg
94.02 KB
names4.jpg
names4.jpg
92.66 KB

Back to main page