The bathroom floor was pulled up to get plumbing and electricity in. Now the rest was pulled up and new plywood laid down. John vacuums the area before putting the plywood down. (Thur 8 May 2003)

bathfloor2.jpg
bathfloor2.jpg
82.31 KB
bathfloor3.jpg
bathfloor3.jpg
86.86 KB
vacbath.jpg
vacbath.jpg
62.58 KB

Update: Wed 14 May 2003

Over the weekend I finished the insulation in the bathroom and moved on to installing wallboard. I started in the shower space with some tile backer. I also did the stairway. Yesterday I put up another piece so I could put the hand rail back up. (Sun 11 May 2003)

joelins2.jpg
joelins2.jpg
80.91 KB
showerspace.jpg
showerspace.jpg
42.31 KB
stairwall1.jpg
stairwall1.jpg
36.97 KB
bathwall10.jpg
bathwall10.jpg
49.77 KB
handrail.jpg
handrail.jpg
72.45 KB