Update: Wed 16 Apr 2003
Over the past few days the electrical wiring has been pulled, the new side window installed, and the hole for the bay window cut.
Here the electricians are pulling the wire (Mon 14 Apr 2003)
wiring1.jpg 42.50 KB |
wiring3.jpg 60.59 KB |
wiring4.jpg 54.94 KB |
Here are some pictures of the wiring (Mon 14 Apr 2003)
wired2.jpg 83.51 KB |
wired3.jpg 85.97 KB |
The water lines for the bathroom were started on Monday (Mon 14 Apr 2003)
plumb2.jpg 81.08 KB |
Eric came over and helped us decide were the place lights in the bathroom. (Tues 15 Apr 2003)
liteck2.jpg 81.74 KB |
liteck4.jpg 76.83 KB |
Back to main page