Mo, the floor guy, was going to start sanding on Monday the 24th. We threw him a curve though because we asked him to add flooring under the buffet. He pulled out some of the old boards to weave in the new ones.
New flooring installation (Mon 24 Mar 2003)
newfloor1.jpg 54.25 KB |
newfloor2.jpg 77.63 KB |
floortools.jpg 83.50 KB |
|
newfloor3.jpg 78.52 KB |
newfloor4.jpg 81.69 KB |
floored1.jpg 75.87 KB |
floored2.jpg 76.69 KB |
Joel got into the act, pulling some nails. I left Mo a note about some nails. (Mon 24 Mar 2003)
nailpull.jpg 82.62 KB |
floornote.jpg 77.63 KB |
Mo started sanding (Tues 25 Mar 2003)
sander.jpg 57.36 KB |
sanding1.jpg 50.82 KB |
sanding2.jpg 52.43 KB |
frontsand1.jpg 73.05 KB |
frontsand2.jpg 76.43 KB |
hallsand.jpg 48.40 KB |
Update: Mon 31 Mar 2003
The sanding is complete. The first coat of finish is on. Mo
had hoped to get the other two coats on over the weekend,
but I had turned off the heat so the first coat didn't dry
by Saturday morning. We got to do some other things around
the house instead.
Now we know that the house needs to be at least 60 to
allow the floor to dry completely. It has been cooler the
past couple of days so it got down to about 50 in the
house. We didn't want the furnace on so it wouldn't blow
dust onto the wet finish.
Sanding complete (Thur 27 Mar 2003).
sanded1.jpg 43.51 KB |
sanded2.jpg 75.48 KB |
sanded3.jpg 73.20 KB |
Sanding Equipment (Thur 27 Mar 2003).
floorequip.jpg 80.75 KB |
sandequip2.jpg 78.75 KB |
sandequip3.jpg 74.53 KB |
First coat of finish (Oil based polyurethane) (Sat 29 Mar 2003).
1stcoat1.jpg 73.79 KB |
1stcoat2.jpg 53.23 KB |
1stcoat3.jpg 72.60 KB |
1stcoat4.jpg 74.73 KB |
1stcoat5.jpg 47.24 KB |
1stcoat7.jpg 77.51 KB |
1stcoat8.jpg 76.49 KB |
"Joel's almost patented cardboard baseboards". I pulled the baseboards out in the kitchen. Mo was afraid that the plaster would fall on the floor after he applied more coats of finish. I put up some cardboard ones so he could put more coats on in the kitchen.
cardboards.jpg 70.43 KB |
Update: Wed 2 Apr 2003
Mo should be putting on the third coat of finish today. The floor is looking great. Here are some pictures of him applying the second coat.
apply2.jpg 81.57 KB |
apply3.jpg 49.04 KB |
apply6.jpg 51.84 KB |
apply8.jpg 53.11 KB |